Skip to content
ffespec.com
SchedulesProcurementPricingAbout
Sign inStart free
SchedulesProcurementPricingAbout
Sign in
The Operating System for FF&E Studios

FF&E specification & procurement software, from first spec to final sign-off.

ffespec.com is the purpose-built workspace for interior designers, architects, and contractors. Manage specifications, RFQs, procurement, 3D models, and client presentations in one place.

Start free trialExplore features
Free 7-day trial
No credit card required
Xero & BIM compatible
A closer look at your workspaceIllustrative project preview
Projects/Greenwich TownhousePhase 2: Sourcing
SCALMK
Filter by room, finish, supplier...
TypeItem & CategoryFinish & SpecsVendorQtyTradeClientStatus
Teak and Cane Lounge ChairCH-01 · Seating
Solid Teak & Natural CaneExample supplier A2$2,450$3,200Approved
Travertine & Fluted Opal PendantLT-03 · Lighting
Honed Roman Travertine, BrassExample supplier B1$3,800$4,950Ordered
Monolithic Calacatta Viola Coffee TableTB-02 · Casegoods
Honed Calacatta Viola MarbleExample supplier A1$5,100$6,600Client Review
Belgian Linen Custom DraperyTX-08 · Soft Furnishings
Oatmeal 100% Belgian FlaxExample supplier C4$1,120$1,480Delivered
4 items shown of 24 total|Trade Cost: $12,470
Client Schedule Total:$16,230+23.2% Margin
✓

Client Approved

Sign-off link accepted

Pierre Jeanneret Armchair
CH-01Floating Back Chair

Teak & Cane · Cassina · $3,200

Integrated Workflow

Specifications, supplier quotes and invoicing, in one project workspace.

Replace messy spreadsheets, disconnected cut sheets, and untracked emails with a single source of truth designed specifically for high-end interior architecture and FF&E procurement.

STEP 01

Schedules & Finish Libraries

Build dense FF&E schedules with finishes, dimensions, tearsheets, and automatic trade/client markup calculation.

Specify
STEP 02

RFQs & Purchase Orders

Dispatch branded RFQ packages to suppliers, compare trade bids side-by-side, and track lead times to site.

Procure
STEP 03

Client Portals & 3D Decks

Send interactive, password-protected web presentations with BIM/IFC models and capture line-by-line client sign-offs.

Present
STEP 04

Invoicing & Xero Accounting

Generate deposit requests, progressive invoices, and sync customer billing directly with your Xero accounting ledger.

Sync
The studio workflow, illustrated

From FF&E specification to client approval and delivery.

See how ffespec.com connects the creative decisions and practical details behind an exceptional interior.

01

Design & client collaboration

Material swatches connect to a walnut lounge chair and specification card, then to a client presentation of the furnished room.

From a material palette to a shared vision.

Give every selection a clear story. Bring inspiration, specification details, and client feedback into the same project workspace.

  1. 01
    Curate

    Gather inspiration and finishes.

  2. 02
    Specify

    Record the details behind each selection.

  3. 03
    Present

    Share the vision for feedback and approval.

02

Procurement & project coordination

Furniture specifications and supplier quote sheets connect to a procurement timeline and shipping crate, then to a furnished miniature interior.

Carry every considered detail through to site.

Keep supplier quotes, item status, and project milestones close to the original specification, so your team can follow each selection through delivery.

  1. 01
    Request quotes

    Package specifications for suppliers.

  2. 02
    Track procurement

    Follow item status and lead times.

  3. 03
    Coordinate delivery

    Keep the team aligned on milestones.

Features & Modules

FF&E schedules, procurement and client reviews.

Keep specifications, supplier requests, project files and client feedback connected across residential, commercial and hospitality projects.

Live Math Engine

FF&E Schedule & Specs

Dense, searchable tabular workspace with room filtering, tearsheet attachments, trade discounts, and automated client markup formulas.

  • Organize selections by schedule, room, and category.
  • Keep dimensions, finishes, quantities, and supplier references together.
  • Review trade costs and client pricing alongside each item.
Explore FF&E Schedule & Specs →
Supply Chain

Procurement & Logistics

Track every item from initial spec to quote, deposit, order placed, factory production, freight, customs, and site delivery.

  • Review product status and supplier information in one workspace.
  • Keep quantities, lead times, and ordering notes beside the specification.
  • Follow each selection as it moves toward delivery.
Explore Procurement & Logistics →
Multi-Supplier

RFQ & Bid Comparison

Package specs into clean PDF & online RFQs, dispatch to multiple suppliers, and compare line-by-line pricing side by side.

  • Group selected products into a supplier quote request.
  • Include specifications, quantities, and a response deadline.
  • Review submitted pricing and supporting quote attachments.
Explore RFQ & Bid Comparison →
IFC · GLB · STEP

3D BIM & Model Viewer

Inspect architectural IFC building models and 3D furniture files right inside your browser without expensive desktop CAD seats.

  • Open supported model files directly from your project files.
  • Inspect furniture geometry and architectural models in context.
  • Share files through client links with an expiry date.
Live Links

Client Presentations & Portal

Share interactive digital mood boards and decks where clients can review finishes, approve specs, and submit feedback online.

  • Bring mood boards and product selections into presentation slides.
  • Collect client feedback through shared presentation links.
  • Give clients a single portal for the project material you have shared.
Studio Library

Master Catalog & Finishes

Maintain a studio-wide database of proven materials, lighting, sanitaryware, and trusted vendor contacts with historical trade terms.

  • Save reusable products to a shared studio library.
  • Keep imagery, supplier details, and specification fields together.
  • Add library products to another project schedule.
Phase Tracking

Project Timelines & Tasks

Visual Gantt-style milestones, task assignments, and procurement lead times so your team never misses an install date.

  • Plan project phases, milestones, and task dependencies.
  • Assign team responsibilities and track task progress.
  • Share a read-only timeline with your client.
Draft Invoices

Invoicing & Xero Integration

Prepare project invoices and send customer details, quantities, and line prices to Xero as drafts for accounting review.

  • Prepare project invoices with your company details.
  • Connect your workspace to Xero in Settings.
  • Send invoices to Xero as drafts for review.
Explore Invoicing & Xero Integration →
An interior design studio worktable with stone and textile samples, architectural drawings, and a laptop displaying an illustrative specification workspace.
For the considered interior

Your eye for detail.
A workspace to match.

From the first linen swatch to the final lighting selection, your work is defined by the details. Give them a home with specifications, supplier information, and client presentations in one place.

Bring your next project together
Refined residential living room with an ivory curved sofa, walnut lounge chair, travertine table, and warm natural light.Private residences

Every finish has a place. Every choice has a record.

Keep bespoke furniture, material selections, and room-by-room specifications connected to the client conversation.

Room schedules / Finish details / Client presentations

Boutique hotel lounge with sculpted plaster arches, caramel seating, slate blue chairs, and warm bronze pendant lighting.Boutique hospitality

A considered guest experience, down to the last detail.

Bring lighting, furniture, supplier quotes, and procurement status together across rooms and shared spaces.

Supplier RFQs / Procurement tracking / Project timelines

Multi-Disciplinary Teams

Built for every seat at the design table.

Whether you're selecting a bespoke textile or confirming crate dimensions with a freight handler, ffespec.com keeps everyone on the exact same page.

Interior Designers

Specify fabrics, fixtures, and custom casegoods. Generate client-ready presentations and capture digital sign-offs in seconds.

Live pricing & markup engine
Interactive visual client portal
Custom finish & swatch library

Architects & Planners

Align complex architectural finishes with project scope, navigate in-browser BIM IFC models, and keep all disciplines on schedule.

In-browser 3D/IFC model viewer
Phase & milestone timeline Gantt
Multi-room schedule breakdown

Procurement Agents

Bundle specifications into multi-vendor RFQ packages, negotiate trade discounts, and oversee production lead times to site.

Automated RFQ packages & bids
Direct Xero invoice sync
Deposit & shipping tracking

Builders & Project Managers

Access verified cut sheets, dimension specs, and real-time delivery statuses directly on mobile while walking the site.

Mobile-optimized spec access
Instant tearsheet PDF export
Live delivery & room tag log
Simple, flexible pricing

FF&E software pricing. One plan for your studio.

Choose the seats your studio needs. Your subscription adjusts as you add or remove licences.

7-day free trial

ffespec Studio

$35AUD per user / month

Billed monthly for your selected seats. Cancel any time.

Unlimited projects and specifications
Schedules, presentations and client sharing
Procurement, RFQs and invoice tools
Shared product and finish library
Team roles and licence management
5 GB of file storage included — add more at $10 per GB per month
Billing through Stripe
Start 7-day free trial

One trial seat. No card required to start. Any applicable tax is shown at checkout.

You choose your seat count

Start with one seat or bring your team. For example, 4 seats cost $140 per month (or $1,392 billed annually). Owners manage licences from Billing & licences.

Billing follows your seat count

Add seats with a prorated charge for the remaining period. Reduce unused seats and receive a prorated credit on your next invoice. Switch between monthly and annual billing any time.

Clear rules for your team

Every workspace member uses a seat, including owners. Pending invitations reserve seats. Clients reviewing shared links do not need a paid licence.

Questions, answered

FF&E software, explained.

What is FF&E?

FF&E stands for furniture, fixtures and equipment — the movable furniture, lighting, fittings, soft furnishings and equipment specified for an interior project. An FF&E schedule lists every item with its finish, dimensions, quantity, supplier and pricing so it can be approved, procured and installed.

What is FF&E specification software?

FF&E specification software replaces spreadsheets and scattered cut sheets with one structured schedule. ffespec keeps each selection’s specification, finishes, tearsheets, trade cost and client price together by room and category, then carries the same record through quoting, procurement, client sign-off and invoicing.

Who is ffespec built for?

Interior designers, interior architects, architecture practices, procurement agents and the builders and project managers who deliver their projects. Everyone works from the same specification, and clients review and approve through shared links without needing a paid seat.

How do clients approve items?

You share a password-protected presentation or schedule link. Clients review finishes, approve items line by line and leave feedback online, and every response is recorded against the specification.

Can I send RFQs to suppliers and compare quotes?

Yes. Group selected products into an RFQ package with specifications, quantities and a response deadline, send it to multiple suppliers, then compare their pricing side by side and track lead times through to delivery.

Does ffespec integrate with Xero?

Yes. Connect your workspace to Xero in Settings, then convert approved schedules into deposit requests and progressive invoices and send them to Xero as drafts for review.

How much does ffespec cost?

AUD $35 per user per month, or $29 per user per month billed annually ($348 per user, once a year). Both plans include a free 7-day trial and no credit card required to start. Every workspace includes 5 GB of file storage, with extra storage available at $10 per GB per month.

Get Started Today

Bring clarity and precision to your next project.

Bring your specifications, supplier requests and client reviews into one workspace built for interior designers, architects and procurement teams.

Start 7-day free trialSign in to workspace
ffespec.com

The collaborative specification, procurement, and client presentation platform for architecture and interior design teams.

Product

  • FF&E Schedule
  • RFQ & Procurement
  • Xero Integration
  • Pricing Plans
  • All Features

Resources

  • Schedule Example
  • Who It Is For
  • About ffespec
  • Contact Us

Account

  • Sign In
  • Start Free Trial
  • Pricing Plans

© 2026 ffespec.com. All rights reserved.

Built for modern design & build studios